当前位置:七七学习网文档大全求职指南求职简历英文简历范文高级品管英语简历范文» 正文

高级品管英语简历范文

[10-10 21:23:13]   来源:http://www.77xue.com  英文简历范文   阅读:8610
概要:Personal InformationName: ** Wang Gender: MaleDate of Birth: August 1967 Mobile phone: 130***E-mail: *@*.com, 1234@yahoo.comEducation backgroundDuring 1986-1990 , studied at North-west University in XianAn , major in Mechanic & Equipment engineering .Graduated with Engineering Bachelor degree in 1990.Working Experience1 .July 1990 – June 1997 Worked in Sino-PEC (Petro-chemical company ) as Mechanical engineer & Project
高级品管英语简历范文,标签:英文简历范文下载,毕业生英文简历范文,http://www.77xue.com

Personal Information

Name: ****** Wang      Gender:  Male

Date of Birth: August 1967             

Mobile phone: 130*******

E-mail:  *****@*****.com, ****1234@yahoo.com

Education background

During 1986-1990 , studied at North-west University in XianAn , major in

Mechanic & Equipment engineering .

Graduated with Engineering Bachelor degree in 1990.

Working Experience

1 .July 1990 – June 1997 

Worked in  Sino-PEC (Petro-chemical company ) as Mechanical engineer &

Project engineer .

During 1990-1994 , located in TianJin and worked as mechanical engineer .

During 1994-1996 , located in Singapore and worked as project manager in the Sino-PEC & SHELL-based JV.

2. July 1997 – Nov 2003

Served in Motorola (China) Electrical Ltd . Company in TianJin .

-During 1997-2001, take the role of Section Header in Manufacturing

Operation Department, Mobile Device Sector. Main job responsibility as follows:

Manpower management on mobile phone production line.  Problem solving and feed back on manpower arrangement, organizing, corresponding and employee relationship. 

Material management on mobile phone production line, such as sub system of ERP, material cycle count system, rejected material return process flow etc. 
Cost control and management of workshop. Production cost reduction through employee training, industry flow optimizing, material scrap control etc. 
Process flow control and management on mobile phone production line. 

Continuous improving productivity through implementing super line management on back end of mobile phone production, optimizing production process flow. 

Mass production control and management of new product. From prototype ramp up to mass production stage, Champion new product in manufacturing team ,timely feed back production capacity, quality, process flow, equipment, material issue. 

Cooperate with engineering team, solve problem in time, feedback issue to supplier timely and effectively. 

-During 2001-2003, acted as Outsourcing Project Manager at CMM Dept (Contracted Manufacturing Management)  in PCS .TJ (Personal Communication Sector )

My job covered the following area ,

On site auditing to targeted sub supplier for PCBA building and assembly of mobile phone

Make out the feasible report of possible sub supplier for high level management .

Management & monitoring of daily operation of supplier , focused on  material supplement, inventory & scrap & shrinkage of material,, steadiness & consistency of process flow as the criteria when it be qualified .

Submit the report of verification & highlight of quality issue in supplier to Motorola  .

Production schedule control in supplier based on Motorola`s demand  .

[1] [2]  下一页


Tag:英文简历范文英文简历范文下载,毕业生英文简历范文求职指南 - 求职简历 - 英文简历范文

《高级品管英语简历范文》相关文章

联系我们 | 网站地图 | 范文大全 | 管理知识 | 教学教育 | 作文大全 | 语句好词
Copyright http://www.77xue.com--(七七学习网) All Right Reserved.
1 2 3 4 5 6 7 8 9 10